Terms and Conditions
TERMS AND CONDITIONS
These Terms and Conditions, together with the accompanying Quote or Proposal describing the scope of the Work and pricing (collectively, the "Agreement"), constitute Top Job Asphalt's offer to perform the Work described therein. The Quote or Proposal is incorporated into and made a part of this Agreement by reference. By accepting the Proposal, signing this Agreement, authorizing Top Job Asphalt to begin the Work, making any payment toward the Work, or otherwise engaging Top Job Asphalt to perform the Work, Customer acknowledges that Customer has read, understands, and agrees to be bound by this Agreement. This Agreement constitutes the entire agreement between Top Job Asphalt and Customer regarding the Work and supersedes all prior and contemporaneous negotiations, discussions, representations, understandings, promises, and agreements, whether oral or written, relating to the Work. No prior, contemporaneous, or subsequent oral statement, promise, or representation shall modify, waive, or supplement this Agreement. If Customer issues or requires a purchase order, subcontract, work order, or any other document or agreement containing terms that differ from or conflict with this Agreement, such document shall be deemed solely an administrative document for Customer's internal purposes and shall not modify, supplement, or supersede this Agreement unless expressly agreed to in a written amendment signed by an authorized representative of Top Job Asphalt. In the event of any conflict between this Agreement and any document issued by Customer, this Agreement shall govern and control. Any additional or changed work requested or authorized by Customer, whether orally, in writing, or by conduct, shall be subject to these Terms and Conditions. Customer agrees to pay Top Job Asphalt's reasonable charges for all additional or changed work performed. Additional or changed work shall not alter, waive, terminate, or invalidate any provision of this Agreement, including the original scope of Work, specifications, pricing, warranties, limitations of liability, or any other Terms and Conditions, unless Top Job Asphalt expressly agrees otherwise in a written amendment signed by an authorized representative of Top Job Asphalt. This Agreement may be amended only by a written instrument signed by Customer and an authorized representative of Top Job Asphalt; provided, however, that additional or changed work may be requested and authorized without a formal written amendment and shall remain governed by this Agreement.
Estimate Incorporated Into Agreement.
The accompanying written Quote or Proposal, if provided, is incorporated into this Agreement and defines the scope of Work and pricing. Any work not specifically identified in the Quote or Proposal is excluded unless authorized as additional work pursuant to this Agreement. Quantities stated in the Quote or Proposal are estimates only. Customer shall be invoiced based on the actual quantities of materials used and Work performed. Any maps, drawings, measurements, or layouts provided by Top Job Asphalt are approximate and may be adjusted based on Customer requests, field conditions, site logistics, constructability, or recommendations of Top Job Asphalt's personnel. Unless otherwise expressly stated in the Quote or Proposal, pricing is based on a non-prevailing wage job site and does not include certified payroll requirements. Only one discount may be applied to any Quote or Proposal unless otherwise expressly stated in the Quote or Proposal. Material terms of the Quote or Proposal include, but are not limited to, the pricing, scope of Work, and scheduling or anticipated timing of performance.
General Notice Provision Warranty Claims, notice of cancelation, notice of defect, notice of change in scope, and all other communication affecting the contract shall be sent to coordinating@topjobasphalt.com.
Scope of Work The scope of work to be performed is described in the quote. However, the following limitations and terms apply to work quoted:
Crack Seal:
Not included: vertical seams, weed removal, weed damage, sterilant, herbicide, adhesion to deteriorated or chemically impacted pavements, fatigue cracks, hairline (under 3/8" width and depth) cracks, foundation cracks or edges, concrete edges, or cracks 1 inch wide and larger. Cracks may be sealed before or after sealcoating. Cracks without a visible bottom sometimes have an unseen void below the asphalt due to erosion. These voids can require significantly more material than anticipated, which will be billed at the contract rate. Cracks are sealed, not filled. Crack seal material may settle in cracks after application; this does not mean the crack is not sealed. Cracks that are sloped cannot be filled to the top, as the material flows down the crack and out the end or across the surface. Customer may request additional material be applied, however additional costs will apply, including mobilization costs.
Concrete:
Pump trucks are not included in the price unless specified. Customer is responsible to provide and designate large equipment access. Additional charges will apply if limited access necessitates using a pump truck. Cold Weather protection is the responsibility of the customer unless specified in the estimate. Drainage is not guaranteed if surrounding conditions prevent obtaining a minimum 2 percent grade. While every effort is made to prevent cracks, they are inevitable, and not covered under warranty. Sealing concrete helps prevent damage from water, ice melt or salt and other chemicals but does not repair already damaged concrete. Concrete should be sealed at time of installation and every 1 year thereafter. Color changes may occur during the concrete sealing process.
Paving and Dirt Work:
Grading and base preparation is the responsibility of the customer unless included in the estimate. Final or Finish grade does not include rough grade. Rough grade sets slope and drainage. If grading of sub-grade, sub-base, and base are not included in estimate, and soft spots are found while paving or preparing to pave, the asphalt in those areas will not be covered by warranty. If excessive water is found during asphalt removal, it may need to be pumped out and area allowed to dry, or base materials replaced. It is assumed that the customer has addressed drainage with a qualified engineer prior to requesting placement of asphalt or concrete. Puddles or bird baths less than 1/2" deep are considered within spec. Top Job Asphalt is not responsible for drainage when existing slope is less than 3% or when rough grade is established by another party, or in cases where Top Job Asphalt is providing grading/base prep services but surrounding structures/conditions prohibit obtaining a minimum 3% slope. Altering existing slope and drainage utilizing an overlay is limited, therefore Top Job Asphalt is not responsible for drainage on overlays. Asphalt edges are not perfectly straight and shall be +/- 6 inches. If perfectly straight/uniform edges are desired, we recommend concrete ribbons to contain the asphalt. Cracks around culverts are not covered by warranty.
Remove and Replace pricing and performance is based on existing asphalt up to 3 inches or concrete up to 4 inches thick (or as specified in the estimate). If additional thickness is found, additional charges will apply. Placement of asphalt has been bid for that function alone and does not include testing or excavation of the base, sub-base or correction of drainage issues unless specifically listed. If it is determined during asphalt removal that the base or sub-base has been compromised by water or otherwise, additional charges will be negotiated to correct the unforeseen problem. If during excavation or grading, structures such as pipes, hard rock, hardpan, concrete or metal are found, additional charges will apply to remove the obstructions if they impede grading or other work. Mat thickness quoted shall be considered to be the average, not minimum. To protect patches from premature failure, patches are typically installed slightly higher than surrounding pavement, with a slight crown to shed water. This helps the patch to stay at or above grade if it settles. It is unrealistic to expect patches to be the same color, texture, or on the same plane as existing pavement. Hand raked areas will not be of the same quality as machine laid surfaces.
Skin Patching:
Skin patching does not eliminate trip hazards. If customer requires patching with an even surface, Remove and Replace should be requested. Customer understands that skin patching has feathered edges that may deteriorate more quickly than the rest of the patch or may be damaged by snow plows or other abusive traffic.
Milling:
Milling asphalt requires large equipment (80,000+lbs) to work in close proximity to structures, concrete, landscaping, trees, underground utilities, etc. We work extremely hard to avoid damage to adjacent landmarks, but in some cases, damage is inevitable, and Top Job Asphalt is not liable. Damage or trimming of trees may be required, additional charges may apply. If mill teeth hit unexpected sub surface objects such as stone, concrete, or steel, and are damaged, additional charges may apply. Milling is extremely noisy and dusty. The mill will not fit into every space, and Top Job Asphalt reserves the right to decide whether to use a smaller mill, remove, or leave intact, areas inaccessible to the mill. Transporting milling and paving equipment requires strategic planning. As such, equipment may need to be transported to the jobsite a day or more prior to starting the job, and picked up a day or more after completion. Customer shall make every reasonable effort to accommodate loading, unloading, storage, and security of equipment while it is on the jobsite.
Surface Treatments:
Top Job Asphalt uses shields to minimize over-spray. Some over-spray or drips on adjacent surfaces may occur. If customer is particular about keeping sealant off any object on or near area to be treated, it is the customers responsibility to tape off, cover or remove the item from the area. If items are not protected or removed and get sealant on them, cleaning shall be the sole responsibility of the customer. Vehicles and other items of value must be at least 50 feet away from work zone. Damage caused by failing to remove encumbrances, shall be the responsibility of the customer. Wind can sometimes carry sealer mist over extended distances. If job is in a windy area, or strong wind is forecasted, or if it is windy on the date scheduled, customer should make additional effort to keep vulnerable items away from overspray. Cancellation fees will not be applied to jobs that cancel the day of as a result of wind, unless the crew has already mobilized. We always blow dust/light debris off sealcoat jobs prior to application, however, in the fall, leaves can sometimes fall faster than we can clean them up. In such cases, we will continue to pick up any leaves we can as we proceed, but it is understood that we cannot insure no leaves are sprayed or land in the sealer. Cleaning by Top Job Asphalt is limited to sweeping and blowing off loose dirt and debris. Removal of piles of dirt, gravel, bark or other items is the customers responsibility, and if left, will be sprayed around. Oil spots, dirt and mud will be scrubbed with wire bristle push brooms and blown off. Pressure washing is the responsibility of the customer unless specifically quoted in the estimate. Because there is a balance between opening an area to traffic early which may void or reduce the warranty, allowing longer cure times, inconvenience and lost revenue, it is the responsibility of the customer to open service areas to traffic. Top Job Asphalt may advise and recommend but ultimately it is the choice of the customer. Dirt, mud, and oil can settle in pores or become ground into pavement which can negatively affect adhesion of surface treatments and crack seal. The best way to address these conditions is by washing the surface with water and soap. Oil Spot primer is not included in the estimate unless requested by the customer and specified in the contract. Sealer is not warranted in these areas unless effectively washed. Unless specified otherwise or a vac truck is listed in the estimate, all debris removed from parking lot will be disposed of on site and does not include haul off. If haul off is required, additional charges will apply.
Payment & Security
Payment is due within five (5) days after Top Job Asphalt provides written or oral notice that any portion of the Work or any line item included in the Agreement has been completed. Customer's obligation to pay is not contingent upon completion of other portions of the Work unless otherwise expressly agreed in writing by Top Job Asphalt. Any unpaid balance remaining after the due date shall accrue a finance charge of two percent (2%) per month or the maximum amount permitted by applicable law, whichever is less. Customer agrees to pay all reasonable costs incurred by Top Job Asphalt in collecting unpaid amounts, including collection costs, reasonable attorney fees, court costs, and other expenses incurred in enforcing this Agreement. Customer acknowledges and agrees that Top Job Asphalt retains all rights and remedies available under applicable law to secure payment for labor, materials, and services provided, including the right to pursue and record a mechanics lien or other available lien remedy against the referenced property, subject to applicable statutory requirements. A returned payment fee of thirty-five dollars (35.00)π€πππππππ π ππ π ππππππππ¦πππ¦ππππ‘πππ‘π’πππππππππ βππππππ.π΄ππππ’ππ‘π ππππππππππππ π‘ππ’ππππ¦πππ π’πππππ‘π‘πππππ25.00) until the account is brought current.
Disclaimers
Customer acknowledges that work includes the mobilization of work, equipment, and material. Costs for Top Job Asphalt include appropriate crew and equipment mobilization required to complete the job as specified. Pre-ordering of material is required, and unused quantities are frequently paid for by Top Job Asphalt and cannot be used at a later time. Fees also apply to disposal of unused materials. As such discounts for unused materials are typically not possible, and are at the discretion of Top Job Asphalt. In the event a Customer reduces the scope of work without 14 days notice no price reduction will be made.
Mobilization, Delay, Standby, and Cancellation Charges
Customer acknowledges that asphalt paving requires significant scheduling, labor, equipment, material coordination, and transportation arrangements. Customer is responsible for ensuring that the job site is properly prepared, accessible, and ready for the scheduled Work. All Work includes one (1) mobilization unless otherwise specified in the Quote or Proposal. Mobilization fees will be charged if Top Job Asphalt mobilizes to the job site and the Work cannot proceed due to site conditions, Customer actions or omissions, cancellation, postponement, or any other circumstance outside of Top Job Asphalt's reasonable control. Additional mobilizations required for reasons outside Top Job Asphalt's control, including but not limited to weather, hot plant closures or availability issues, Customer delays or indecision regarding change orders, additional or changed Work, site access issues, or other scheduling impacts, will be charged to Customer. Cancellation or rescheduling of a paving project by Customer within fourteen (14) calendar days of the scheduled start date may result in a cancellation or rescheduling charge of up to $6,000. If Top Job Asphalt's crew arrives at the job site and the site is not ready, or the Work cannot proceed for reasons outside Top Job Asphalt's control, Customer may be responsible for mobilization charges, standby charges, additional work day charges, and any other applicable costs. Top Job Asphalt's efforts to accommodate delays, reschedule Work, or mitigate Customer impacts shall not constitute a waiver of any applicable mobilization, standby, cancellation, or delay-related charges.
Liens
The Customer is required to make timely payment to Top Job Asphalt and, when appropriate, directly to subcontractors. Top Job Asphalt will not finalize any lien against the Customer who makes timely payment. However, under local law, a mechanicβs lien may be filed by any contractor, sub-contractor, laborer, supplier or other entity that improves your property but is not paid for their labor, services, or material. This right to lien against your property is made to obtain payment. Customer agrees to indemnify Top Job Asphalt from any costs or fees of litigation incurred by Top Job Asphalt relating to any third-party subcontractor filing of a mechanicβs lien for non-payment by Customer.
Customer Responsibilities. PLEASE READ CAREFULLY.
Ingress/Egress:
Pricing provided in the Quote or Proposal is based upon Customer providing sufficient and suitable access to the job site for Top Job Asphalt's personnel, vehicles, materials, and heavy equipment necessary to perform the Work. Customer acknowledges that asphalt paving and related work requires the operation of heavy equipment, including equipment weighing up to approximately 90,000 pounds, in and around existing structures, landscaping, improvements, and other property features. Top Job Asphalt will exercise reasonable care and caution while accessing the job site and performing the Work; however, Customer acknowledges that operating heavy equipment in confined areas and near existing improvements involves inherent risks of incidental damage. Customer is responsible for ensuring adequate access, including suitable roads, driveways, pathways, staging areas, and working areas, for Top Job Asphalt's equipment and vehicles. All access routes to and from the Work area, including areas used for equipment operation, delivery, staging, and material handling, shall be considered part of the job site. If access is inadequate, restricted, unsafe, or otherwise unsuitable, Top Job Asphalt may adjust the Work methods, schedule, pricing, warranties, and guarantees, and Customer may be responsible for additional charges resulting from such conditions.
ADA Compliance:
Top Job Asphalt is not responsible for bringing site conditions to current ADA compliance unless otherwise directed by Customer to do so and such work is explicitly stated in the written proposal/quote. If ADA compliance work is requested, a recommendation will be made in a signed writing and additional charges will apply. It is recommended that a certified ADA consultant view the site to make recommendations and evaluations as required by Federal and State laws; any such evaluations will be at Customerβs expense.
Customer Availability. Customer must have an authorized representative on the job site to approve each phase of work completed. Customer shall have 7 days from notice of completion of each phase to report deficiencies. After 7 days, the work shall be deemed acceptable.
Site Preparation
Mobilization fees, as defined and set forth herein, shall be charged if the Customer does not observe the following obligations:
1. Customer must remove all encumbrances from the site. Unless otherwise specified in a signed writing, Top Job Asphalt is not responsible to clear, clean or remove any items from the Customerβs site prior to the service, including but not limited to vehicles, dumpsters, weeds, vegetation, debris, dirt or sand. If soft spots, structures, concrete, large rocks or other encumbrances are encountered during excavation or other work, additional charges will apply. The area must be cleared at least 50 feet surrounding the project area before the project is scheduled to begin.
2. Customer to ensure all sprinklers and irrigation are turned off to insure water not an encumbrance.
3. Customer is responsible to spray/kill weeds before any service, if needed. After paving, adjacent plant growth must also be controlled by customer to prevent damage to pavement. Top Job Asphalt is not responsible for damage to asphalt from weeds or tree roots.
Damage Incident to Work
Customer is responsible for identifying, marking, protecting, relocating, removing, repairing, or replacing any landscaping, structures, obstructions, utilities, irrigation systems, improvements, or other site conditions that may interfere with or be affected by the Work. This responsibility applies to the project area, access routes, equipment staging areas, and any other areas reasonably used by Top Job Asphalt to perform the Work. Top Job Asphalt is not responsible for damage to these items. Compaction of asphalt requires tremendous force, and exerting such force poses a danger to adjacent structures. Adjacent concrete, siding, landscaping, foundations, walls, trim, doors, and similar items will likely experience movement, impact, and discoloration. While Top Job Asphalt exercises reasonable care to minimize these risks, the Customer is responsible for repairing, replacing, or restoring adjacent items damaged during paving. Backfilling is also the Customers responsibility. Paving should never be performed adjacent to green concrete, and Top Job Asphalt accepts no liability for green concrete. Top Job Asphalt will make reasonable efforts to control traffic and barricade work from third-party interference if traffic control is quoted. Top Job Asphalt is not liable for cleaning, cleaning costs, repair or replacement of any items due to people, animals or vehicles entering areas who are not Top Job Asphalt employees.
Substitutions
At Top Job Asphaltβs discretion, substitutions for equivalent or superior product may be made if specified product is reasonably unavailable. To the extent that the estimate is specified with a unit price, it is agreed that the number of units indicated is an approximation. Additional charges shall apply for any additional units completed as determined by field measurement.
Termination of Contract
The Customer may withdraw from this contract by providing written notice. To avoid cancellation fees, customers must provide at least 7 days' notice before the scheduled project start date. If notice is not given in time, Customers may incur fees related to mobilization, cost of materials purchased, sub-contractor expenses, opportunity cost related to scheduling, or other reasonable incurred costs. If the Customer withdraws after work has commenced, they will be responsible for all costs incurred, which includes mobilization fees, work performed, materials purchased, equipment used, subcontractor expenses, and a reasonable profit. In the event that Top Job Asphalt withdraws from the contract, the customer will be liable for all costs incurred and the value of services rendered up to that point. Top Job Asphalt reserves the right to withdraw from this Contract at any time. Unless otherwise specified in writing, Customer agrees that time is not of the essence, and the timing of project initiation/beginning and completion is not a material term for the Customer (although it remains so for Top Job Asphalt). Customer therefore waives any claims or damages which might be based upon relying upon Top Job Asphaltβs specified beginning date, progress, and/or completion.
Restoration
Unless otherwise agreed by both parties in writing, Top Job Asphalt is responsible only for the completion of the service/project. It should be anticipated that Top Job Asphalt will use heavy machinery up to 25 feet from the project area, including over excavation of areas for installing concrete or asphalt. All subsequent landscape restoration is the sole responsibility of the customer. Pavement edges should be backfilled to support asphalt and/or concrete edges and to slow deterioration/reduce damage from traffic and runoff. Backfill of edges is not include in the quote unless expressly indicated otherwise in writing. Unless off-haul is specified in quote, off-haul of excavated materials is not included.
Notice of Defect & Opportunity to Remedy
Upon completion, Customer must make a thorough inspection of the work performed. To make claim under any type of warranty or guarantee, written notice of any alleged claim or defect discoverable at that time must be given to Top Job Asphalt no later than five(5) days after the completion of the work under this contract. Likewise, alleged claims or defects which are not discoverable during this time, but are discovered later, shall also require the Customer to make a claim to Top Job Asphalt no later than five(5) days after discovery. Customer agrees Top Job Asphalt shall have 60 days to investigate the alleged defect or claim and remedy it before Customer takes any other action toward remedying an alleged defect. Top Job Asphalt shall not be liable for any alleged defect or claim if Customer hires a third party to conduct repairs without Top Job Asphaltβs consent or opportunity to remedy under this provision. Failure to give written notice of a defect as put forth herein shall constitute a waiver of warranty or guarantee for any work. Top Job Asphalt will not warranty nor remedy the work of third parties not under Top Job Asphaltβs supervision. All substantially completed services, including any applicable change orders, late fees, interest, etc shall be due and paid in full prior to any repairs/warranty work. In the event that warranty work is performed prior to payment, and the Customer still refuses to pay, the value of the warranty work shall be added to the balance due. Performance of warranty work is not an admission that the warranty work is justified or required under the contract, or that the original work was sub standard. Warranty work does not invalidate change orders, late fees, or interest, nor does it reset the clock on when payment is due, including any applicable late fees. Any subsequent changes, alterations, repairs, or improvements made to the work after Top Job Asphaltβs work is complete will waive all warranties and guarantees.
Warranty and Limited Remedies
Warranty coverage applies only to qualifying Work performed by Top Job Asphalt and is subject to all exclusions, limitations, conditions, and Customer responsibilities contained in these Terms and Conditions. Top Job Asphalt warrants the quality of its Work as follows, unless otherwise stated in the Quote or Proposal:
- New asphalt pavement: thirty-six (36) months.
- Asphalt overlays and patches: twelve (12) months.
- Surface treatments: thirty (30) days.
These warranties apply only to defects directly caused by Top Job Asphalt's workmanship or materials. Warranty coverage does not apply to damage, failure, deterioration, or conditions caused by Customer, third parties, improper use, neglect, abuse, chemicals, oil, drainage issues, weather, freeze thaw conditions, natural or man-made events, excessive loading, improper maintenance, site conditions, construction activities, equipment, trailers, dumpsters, jacks, kickstands, sharp turns, settling, hillside sloughing, or other causes outside Top Job Asphalt's reasonable control.
No warranty work will be performed unless all amounts owed to Top Job Asphalt have been paid in full, including the original contract balance, used quantities, change orders, late fees, interest, and other applicable charges. Warranty repairs do not restart or extend the original warranty period unless expressly agreed to in a separate written agreement. Warranty work is not itself warranted unless expressly agreed to in writing.
If Top Job Asphalt determines that a condition is covered under warranty, Top Job Asphalt's obligation is limited exclusively to the following remedies:
- Sunken crack seal: Apply additional crack seal.
- Surface treatment delamination: clean and reapply.
- Bird baths: Apply a slurry patch. Any recommended seal coat is not included.
- Asphalt segregation: Apply a slurry patch. Any recommended seal coat is not included.
- Drainage into an existing building: Install a channel drain where feasible.
- Weeds growing through asphalt: Crack seal the affected area after Customer has eliminated the weeds.
- Thin asphalt: Extend the warranty on the affected area by twenty four (24) additional months.
Top Job Asphalt shall determine whether a condition qualifies for warranty coverage and shall determine the appropriate location, size, materials, and repair method. These remedies are Customer's exclusive remedies. Top Job Asphalt is not required to remove or replace unaffected Work, replace an entire paved area, or perform additional Work solely to achieve uniform color, texture, or appearance.
Surface Treatment Limitations
Surface treatment warranties require proper maintenance by Customer. Pavement should be kept clean and swept regularly to maximize the performance and service life of surface treatments.
If primer coat is quoted and not accepted by Customer, surface treatment warranty is void. Small bubbles, pinholes, or surface imperfections may occasionally occur in sealer applications.
Top Job Asphalt will make reasonable efforts to minimize these conditions; however, minor bubbling or imperfections that do not affect the integrity or performance of the sealant or pavement are not considered defects and are not covered. If pavement is wet, exposed to sprinklers during or shortly after application, excessively dirty, contaminated, or otherwise compromised, additional cleaning or preparation charges may apply and warranty coverage may be affected.Top Job Asphalt does not warrant delamination caused by prior seal coats, surface treatments, oil, chemicals, contaminants, ground-in dirt, or existing pavement conditions.
Customer is responsible for informing Top Job Asphalt of the history of existing pavement, including prior seal coats or surface treatments. Applying new seal coat over multiple existing layers may increase the risk of delamination of new and existing layers. Top Job Asphalt may provide recommendations or alternative treatment options; however, existing pavement conditions may affect performance.
Paving Limitations
Residential paving is designed for ordinary residential vehicular traffic only. Customer must notify Top Job Asphalt before installation if unusual use is anticipated, including commercial traffic, heavy equipment, or industrial use. Pavement is not rated for forklift traffic unless specifically stated in the Quote or Proposal.
New asphalt should be sealed between one (1) month and twelve (12) months after installation as recommended by Top Job Asphalt to reduce cracking and shrinkage and to maintain warranty coverage.
Pavement installed after October 15th is not eligible for warranty coverage unless otherwise agreed in writing.
Visible cold joints, warm joints, seams, or transitions may occur during normal paving operations due to equipment, weather, material availability, or job conditions. These conditions are not considered defects when they do not affect the structural performance of the pavement. Saw cutting of seams or joints may be performed when Top Job Asphalt determines it will improve the finished result.
Base, Subgrade, and Existing Conditions
If base material is not installed by Top Job Asphalt, Customer assumes responsibility for the suitability, preparation, and compaction of the base materials. Top Job Asphalt does not warrant the suitability or compaction of base materials, subgrade, fill materials, or existing conditions not installed or controlled by Top Job Asphalt.
Settling caused by improperly compacted fill, trench backfill, utility work, disturbed subgrade, or previously excavated areas is not covered. When existing base or subgrade has been excavated, backfilled, or disturbed more than twelve inches (12") below the asphalt surface, Top Job Asphalt does not warrant against settlement or resulting damage unless the excavation and backfilling were specifically included in Top Job Asphalt's contracted scope of Work and performed by Top Job Asphalt.
Paving warranty applies only when asphalt is installed at a minimum thickness of three inches (3"). Damage caused by chemicals, natural disasters, man-made events, or other conditions outside Top Job Asphalt's control is excluded.
License for Use of Likeness
By accepting this quote customer grants Top Job Asphalt the use of pictures, video, etc of before, during, and after representations of the project and adjacent background landscape and structures in our advertising, educational and training materials, etc. If you would like to opt out of using media from your property please notify us in writing. Media generated from projects will NOT be used as negative examples without explicit written permission from customer.
Choice of Law. Utah law shall govern for purposes of this contract on any dispute arising hereunder and jurisdiction and venue shall solely be in the courts of Cache County, Utah.
Indemnity. In the event that any lawsuit or claim is made by a third party against Top Job Asphalt relating to the Customerβs premises, Customer agrees to indemnify Top Job Asphalt for all attorneyβs fees and costs incurred by Top Job Asphalt relating to the dispute. This agreement to indemnify Top Job Asphalt shall apply completely, to all things except to those costs and fees incurred as a result of acts/omissions of negligence, gross negligence or intentional behavior of Top Job Asphalt itself. This provision shall apply to the extent allowed by Utah law.
Limitation of Damages. Customer acknowledges and agrees that time is not of the essence under this Agreement. Except as otherwise expressly provided herein, Top Job Asphalt shall not be liable for any consequential, incidental, special, indirect, exemplary, or punitive damages, including but not limited to damages arising from delays in scheduling, delays in completion, or the timing or manner of performance. Customer's exclusive remedy, and Top Job Asphalt's total liability for any claim arising out of or relating to this Agreement or the Work, shall be limited to the reasonable cost of repairing or replacing defective Work performed under this Agreement.
Attorneys Fees & Costs. In the event of a dispute, the court shall declare a prevailing party. The prevailing party shall be that party which, on the whole, is less culpable or in less breach of contract than the other party. The non-prevailing party shall be liable for the prevailing partyβs costs and attorneyβs fees incident to the dispute. The amount of which is to be determined by the court. Damages shall not exceed the value of work performed, attorney fees, and interest due, except as outlined hereafter.
The prevailing party shall be entitled to compensation for any negative press or reviews initiated by the other party, in the amount of $4000 per occurrence. An βoccurrenceβ shall be defined as any article, post, review, conversation, video, article, or share of such through any medium. Additionally, the prevailing party shall be entitled to any collection costs and attorney fees incurred in the process of obtaining said compensation. This provision does not preclude the prevailing party from seeking additional remedies in court for defamation or other harm.
Severability. In the event any part or section of this contract is found unenforceable or ambiguous, to the extent allowed by law, the court or arbitrator shall reform the contract to seek the intended purpose of the provision to the extent allowed under Utah law. If there can be no reformation, that unenforceable portion shall not, in any way, affect the enforceability of any other provision of this contract.
Idaho Preliminary Notice. Top Job Asphalt provides to Idaho residential Property Owner this disclosure statement as required under Idaho Code Β§45-525 in connection with this contract to construct, alter, repair or make improvements on residential property, if property is in the State of Idaho.
- The right at the reasonable expense of the homeowner or residential real property purchaser, to require that the general contractor obtain lien waivers from any subcontractors providing services or materials to the general contractor;
- The right to receive from the general contractor proof that the general contractor has a general liability insurance policy including completed operations in effect and proof that the general contractor has workerβs compensation insurance for his employees as required by Idaho law;
- The right and opportunity to purchase an extended policy of title insurance from a title insurance company which would provide insurance coverage covering certain liens which may be unfiled or unrecorded; and
- The right to require at the Customer or residential real property purchaserβs expense, a surety bond in an amount up to the value of the construction project.