asphalt paving utah

TTM Technologies,
Logan Utah

Professional parking lot paving and striping in Logan, UT 
Group 48722

Challenge

This commercial parking lot had been deteriorating for years, with ongoing repairs and patchwork dating back to Top Job Asphalt's founding in 2005. Over time, sinking asphalt, extensive cracking, potholes, and repeated patching had left the surface uneven and severely compromised the parking lot's drainage. What began as routine wear and tear had developed into a much larger problem, threatening the long-term stability of the pavement.

 

Poor drainage was one of the biggest concerns. As the asphalt continued to deteriorate, water was able to penetrate the surface, increasing the risk of damage to the underlying base. If left unaddressed, the existing base could eventually become unusable, requiring a much more extensive and expensive reconstruction project.

 

The property owner had already received bids from other asphalt contractors recommending complete removal of the existing pavement and replacement of the underlying base. While this approach would address the deterioration, the significant cost put the project financially out of reach. The challenge was finding a more affordable solution that could restore the parking lot's functionality and extend its lifespan without requiring a complete rebuild.

 

Adding to the complexity, several areas of the property were subjected to heavy loads that the original pavement had not been properly designed to withstand. Delivery truck lanes, heavy storage containers, and scrap bin locations were experiencing accelerated deterioration under the weight and repeated use of commercial equipment. These high-stress areas required special consideration to ensure that any improvements would hold up to the property's daily operational demands.

 

For Top Job Asphalt, the challenge was clear: develop a cost-effective asphalt paving solution that addressed drainage problems, accommodated heavy commercial traffic, and protected the existing base while delivering a durable, long-lasting surface.

Group 48724

Solution

Top Job did a careful analysis of the parking lot, including areas where sinking or pumping indicated impacted base material, as well as a detailed map of existing drainage. It was determined that by milling the existing asphalt into the base material, called “Full Depth Reclamation” the base could be fortified and reclaimed. Leaving most of the asphalt in place and turning it into base material had several distinct advantages:

 

  1. Adding 3 inches of base to the existing base substantially increased load bearing capacity and QUANTITY of base material.

  2. Mixing water resistant asphalt into the existing base, and breaking up any clay that had pumped, substantially improved the QUALITY of the base material.

  3. The additional base material allowed the grading crew to rework the grade, resulting in superior drainage relative to even when it was first installed.

  4. Very little asphalt had to be trucked out, or base trucked in, saving the customer hundreds of thousands of dollars.

 

Once the base was fully reclaimed, it was compaction tested and areas where reclamation was insufficient to restore the base were replaced, ensuring extended performance at minimal cost.

 

The main parking areas were paved at 3 inches, and the heavy truck lanes and storage areas were paved at 4 inches. Additionally, steel grid base reinforcement panels were utilized in areas where forklifts transitioned from cement to asphalt, ensuring proper disbursement of energy and a long service life.

Group 48724 (1)

Summary

Through careful planning, open communication, and a thorough understanding of the property's unique needs, Top Job Asphalt was able to deliver a solution that went far beyond simply replacing a deteriorating parking lot. By taking the time to evaluate the existing conditions, understand daily traffic patterns, and identify the areas subjected to the heaviest loads, our team developed a customized paving solution designed specifically for the property's commercial operations.

 

Rather than recommending a costly, full-scale reconstruction, Top Job took an innovative approach that allowed much of the existing material to be reused and reinforced. The result was a stronger, more durable asphalt parking lot with significantly improved drainage, a fortified base, and pavement thicknesses tailored to the demands of each area. Most importantly, these improvements could be accomplished at a fraction of the cost of the complete base replacement proposed by other contractors, saving the property owner hundreds of thousands of dollars.

 

This project demonstrates the value of working with an experienced asphalt contractor who looks beyond the obvious solution. At Top Job Asphalt, we believe the best results come from understanding our customers' needs, thinking creatively, and finding practical solutions that deliver lasting value. Sometimes, the smartest approach isn't to start over, but to make better use of what's already there.

ADA parking compliance is a term used to describe the guidelines set forth by the Americans with Disabilities Act (ADA) for parking spaces.


These guidelines require that parking spaces be accessible to individuals with disabilities, and include features such as designated parking spots, ramps, and signage.


If a business is not ADA compliant, they may be subject to legal penalties. The Department of Justice (DOJ) is responsible for enforcing the ADA and can file lawsuits against businesses that are not in compliance. Businesses that are found to be in violation of the ADA may be required to pay fines, make changes to their facilities, or both. 

Get a Free Estimate

Understanding the costs associated with your asphalt paving project is the first step. We provide free, no-obligation estimates that go over the details of cost, project scope, and include a site map. In most cases, using satellite imagery, we’ll be able to provide accurate estimates regardless of where your project will take place.

Get Started

Prefer a Phone Call?
Let's Chat.

If you have any questions, please don’t hesitate to give us a call. We are available Monday – Friday from 8:00 am – 5:00 pm. We are here to serve you and will happily answer any questions you have regarding your project. Call today!

Call today 435-220-3817

Our Projects

paving temperatures
asphalt paving utah
commercial asphalt paving idaho
asphalt services utah
oil vs water based asphalt sealer
utah asphalt companies

Read Our Latest Blog
with Useful Information

Latest Blog
Types of Asphalt Patching: Choosing the Best Fix for Your Pavement
What Happens If You Never Sealcoat Your Asphalt Driveway?
When Is an Asphalt Driveway Too Damaged for Sealcoating?
Best Time of Year to Install an Asphalt Driveway
Asphalt Driveway Installation: Step-by-Step Guide
How to Prepare Your Property for a New Asphalt Driveway
10 Signs Your Asphalt Driveway Needs to Be Replaced
Driveway Repair vs Replacement: Making the Right Choice for Your Home
Top Asphalt Maintenance Tips for a Durable and Long-Lasting Surface
Buyer's Guide To Asphalt Parking Lot Solutions And Prices