utah asphalt contractor

Lowe's PARKING LOT,
Logan Utah

 Commercial parking lot paving in Logan, UT 
Group 48722

Challenge

The parking lot at this large home improvement store was showing significant signs of aging and surface deterioration after years of heavy customer traffic and daily commercial use. Although multiple asphalt maintenance projects had been completed over time, including crack sealing, the pavement continued to deteriorate. The asphalt surface was beginning to ravel, with loose aggregate breaking away from the pavement, and new cracks were developing despite previous maintenance efforts.

 

For a busy retail property, maintaining a safe, smooth, and accessible parking lot is essential. Constant vehicle traffic, delivery operations, and frequent customer turnover place considerable demands on commercial asphalt surfaces. As pavement conditions worsen, cracks and surface deterioration can affect the appearance and functionality of the parking lot, creating additional maintenance concerns for the property owner.

 

A careful evaluation of the existing asphalt revealed an important distinction: while the surface was deteriorating, there were no visible signs of significant structural failure. The parking lot showed no evidence of sinking, heaving, or fatigue cracking, which can indicate problems with the underlying base. This suggested that the deterioration was primarily limited to the upper layers of asphalt rather than the structural foundation of the parking lot.

 

The challenge was determining how to restore the parking lot's appearance, durability, and functionality without unnecessarily removing and replacing pavement that was still structurally sound. Based on the existing conditions, Top Job Asphalt determined that asphalt milling and overlay would be the most practical and cost-effective approach. This process would allow the deteriorating surface to be removed and replaced with fresh asphalt while preserving the existing base, avoiding the additional expense and disruption of a complete parking lot reconstruction.

Group 48724

Solution

Top Job Asphalt worked Monday through Thursday for two weeks to get this job accomplished without hindering customer access to the store. The parking lot was carefully split into 4 sections, with parking, deliveries, ADA access, trailer/ pro parking, and general access in mind. Top Job worked daily with store managers to ensure unforeseen issues could be handled quickly, and some small modifications to the phasing plan were made to better accommodate the stores needs.

 

 

A major issue was encountered on the first day of paving. The asphalt matte was struggling to meet compaction, even with multiple rollers working full time. It was discovered that the ½” mix design approved by the engineer actually contained some ¾” rock, which was not allowing proper compaction of the 2” overlay. Top Job immediately got to work finding solutions. A new mix design was submitted and approved by the engineer, and Top Job rented a huge roller, designed for paving roads. Needless to say no additional compaction issues were encountered for the remainder of the project.

 

 

The timeframe on this project was extremely aggressive, in order to minimize lost revenue. Mondays and Wednesdays were milling and prep, and paving was performed on Tuesdays and Thursdays. Milling was struggling to keep to the timeframe, so a night shift was scheduled, which enabled the crews to stay on track.

Group 48724 (1)

Summary

Despite several unexpected complications and an extremely tight project timeline, Top Job Asphalt successfully completed this large-scale commercial parking lot project on time and on budget. Through careful coordination, creative problem-solving, and a willingness to go above and beyond, our team was able to overcome challenges without compromising the quality of the finished product or significantly disrupting the store's daily operations.

 

The success of this project went beyond simply delivering a newly paved parking lot. By maintaining close communication with store management and the general contractor, adjusting schedules when necessary, and responding quickly to unforeseen obstacles, Top Job helped ensure that the business could continue serving its customers throughout construction. The result was a restored asphalt parking lot designed to handle the demands of a busy retail environment, completed within the aggressive timeframe established for the project.

 

Both the store management team and the general contractor expressed their satisfaction with the finished project and recognized the extra effort Top Job Asphalt put into keeping the work on schedule. Their appreciation reflected not only the quality of the asphalt paving but also the professionalism, flexibility, and commitment demonstrated by our crews throughout the process.

 

This project is a strong example of what sets Top Job Asphalt apart in commercial paving. We understand that for businesses, time is money, and minimizing downtime is just as important as delivering a durable, high-quality asphalt surface. From detailed project planning to adapting when challenges arise, our goal is to provide commercial property owners and general contractors with dependable paving solutions that meet their needs, respect their budgets, and keep their businesses moving.

Lowes Before

Before

 

Lowes After

After

 

ADA parking compliance is a term used to describe the guidelines set forth by the Americans with Disabilities Act (ADA) for parking spaces.


These guidelines require that parking spaces be accessible to individuals with disabilities, and include features such as designated parking spots, ramps, and signage.


If a business is not ADA compliant, they may be subject to legal penalties. The Department of Justice (DOJ) is responsible for enforcing the ADA and can file lawsuits against businesses that are not in compliance. Businesses that are found to be in violation of the ADA may be required to pay fines, make changes to their facilities, or both. 

Get a Free Estimate

Understanding the costs associated with your asphalt paving project is the first step. We provide free, no-obligation estimates that go over the details of cost, project scope, and include a site map. In most cases, using satellite imagery, we’ll be able to provide accurate estimates regardless of where your project will take place.

Get Started

Prefer a Phone Call?
Let's Chat.

If you have any questions, please don’t hesitate to give us a call. We are available Monday – Friday from 8:00 am – 5:00 pm. We are here to serve you and will happily answer any questions you have regarding your project. Call today!

Call today 435-220-3817

Our Projects

alternatives to asphalt driveway
asphalt logan utah
how long to stay off new asphalt driveway
slag driveway
oil vs water based asphalt sealer
how long to stay off driveway after paving

Read Our Latest Blog
with Useful Information

Latest Blog
Types of Asphalt Patching: Choosing the Best Fix for Your Pavement
What Happens If You Never Sealcoat Your Asphalt Driveway?
When Is an Asphalt Driveway Too Damaged for Sealcoating?
Best Time of Year to Install an Asphalt Driveway
Asphalt Driveway Installation: Step-by-Step Guide
How to Prepare Your Property for a New Asphalt Driveway
10 Signs Your Asphalt Driveway Needs to Be Replaced
Driveway Repair vs Replacement: Making the Right Choice for Your Home
Top Asphalt Maintenance Tips for a Durable and Long-Lasting Surface
Buyer's Guide To Asphalt Parking Lot Solutions And Prices